
1) The pool layout is carefully marked for precision.

2) The dig begins the process for perfection.

3) The hole is carefully prepared to achieve the proper shape and depth.

4) The pool is set in place.

5) The pool is now filled with water and the backfill process begins.

6) The proper plumbing and electrical equipment is installed.

7) The concrete is poured around the pool.